Moreland City Council (Oct 2017 – Dec 2017)
Younger Street, Coburg Right of Way. This project included the re-construction of a 720 sq.m cobblestone laneway using permeable concrete substrate and the installation of 250 lin.m of drainage. All works were conducted within a tight laneway width of 2.8 m with material being ferried using a small bobcat upwards of 150 lin.m.