Ryman Health / VicRoads (Nov 2020)

Diversion of existing stormwater system, installation of 20 lin.m of 1050 mm pipes and 14 corbelled pits adjacent to the busy Burwood Highway in Blackburn.  2 pits had chambers 2 m wide x 2 m long x 2 m deep and required structural certification.  VicRoads quality assurance was also completed as part of this project.

  1. Home
  2. Projects
  3. Drainage and Trench Grate Projects
  4. Ryman Health / VicRoads (Nov 2020)